Pre-spud Documentation Requirements

The documentation listed below must be available at the rig site prior to commencing the operations:

  • Concurrent Drilling Completions and Production Operations (if applicable)
  • Emergency Response…

Pre-Spud Drilling Equipment Suface and downhole Inspections

Prior to commencement of each well the Drilling Supervisor with the assistance of the Drilling Contractor Toolpusher shall perform a full rig inspection and record the results on the Company Drilling…

Pre-Spud Meeting on Site

The Superintendent or Senior Operations Engineer shall conduct a pre-spud meeting on the rig with all relevant personnel directly or indirectly involved with the operations.

The appropriate Drilling…

Additional information